Installation location: USA
Equipment model: CVC-1
Equipment height: 14m
Number of units: 2 sets
Shipping products: washing machine inner drum
Before the installation of the elevator:
Due to the increase in the number of orders, it is necessary to expand the production scale, but the production workshop and the assembly workshop are not on the same floor, and the transportation between floors has not found an effective solution.
At the beginning, the hydraulic elevator is used to transport the product on the pallet, and the speed is very slow. Moreover, frequent manual operation will leave a lot of marks or scratches on the surface of the product, which leads to a high rate of defective products. Therefore, the scale of production has been unable to effectively expand, which can not meet the demand of orders, the boss has to abandon a lot of orders.
Now: Just place the drums on the infeed conveyor line on the 3rd floor and they automatically arrive at the assembly workshop on the 1st floor.
Value created:
The production capacity has changed from 1000 PCS per day to 1200pcs*8=9600PCS per day.
Cost savings:
Salary: 3 workers, 3*$5000*12usd=$180000usd per year
Forklift costs: several
Administrative expenses: several
Recruitment fee: Several
Welfare costs: several
Various hidden costs: several